Don't have an account? Please register
Join us quickly and enjoy exclusive services
Register
Click to Login
Product Center
CIPPE2024 Beijing: Shuangjia Company's booth number is E2178. Welcome to visit!
Home
About Us
Introduction
Culture
Certificates
Strength
Our Products
Drilling Tools for Top Drive
Jars
Inside Blowout Tools
Hole Opener Tools
Stabilizers
Fishing Tools
Milling Tools
Incident Handling Tools
Cementing Tools
Casing Accessories
Subs And Tool Joints
Directional Tools
Well Head Tools
Drill Pipes & Drill Collars
Casings & Tubings
Downhole Motors
Hydraulic Bucking Units
Information
Company News
Company Announcement
Procurement Information
Recruiting
Special Recommendation
Video Center
Download Center
Service Center
QHSE
Needs and Goals
Commitment
Principle
Contact Us
Contact
Sales Network
Inquiry
Feedback
DMS CASING ANCHOR
The structure of the DMS casing anchor is designed with two stages of fluke with different lengths. The first stage is shorter fluke adapted to the borehole with reduced diameter and hard formation, and the second stage is suitable for the borehole with loose and expanded diameter. During the anchoring process, the two stages can interact with each other. The first stage opens first during construction. When the strength of the first stage is insufficient, the second stage opens automatically for joint anchoring, complementing each other. The outer diameter of the anchor jaw is large, up to 560mm. The tool is equipped with an anchor claw locking mechanism to prevent accidental opening during down hole process. Built-in floating hoops, float shoes and guide shoes reduce completion string costs. The two-stage flugs are distributed symmetrically at 90° along the axial direction. This design can not only improve the strength of the anchor, but also improve the adaptability and reliability of the anchor, so as to ensure the successful application of the anchor in shallow loose expanding formation, deep reducing diameter borehole and irregular hard borehole. The two-stage casing anchor at the lower end of the casing string and directly connected with the casing. After the casing reaches the bottom of the well, the pump is circulated, and the drilling fluid is returned from the circulation hole. Normal cementing and impact pressure. After the rubber plug is pressed, sit on the upper rubber plug of the ground anchor, and then slowly hold back the pressure. When the pressure reaches 15-20 MPa, cut the shear pin, the ground anchor rubber plug seat moves down, push the center tube and the connecting rod group, and open The two-stage anchor claw makes it anchored to the well wall, and the prestress of the wellhead lifting reaches the designed tonnage or length under the pressure holding state, and the casing is set afterwards, and the prestress construction of the lifting casing is completed.
CROSSOVER SUB
Crossover sub acts for conversion and connection of drill stem component in petroleum, natural gas and geology drilling work. It is used mainly for connecting of upper drill tools and lower drill tools.
FLOAT VALVE SUB
Float valve is a necessary tool of oil drilling. The float valve sub is a bit sub, and mainly includes near bit float valve sub and string float valve sub. The function is to prevent the mud from bring the drilling cuttings, the silt reverse flow; the bit wellbore is jammed; when blowout, float valve assembly close the wellbore automatically to prevent from spouting in the pipe.
TOOL JOINT
Tool Joints acts for conversion and connection of drill stem component in petroleum, natural gas and geology drilling work. It is used mainly for connecting of upper drill tools and lower drill tools.
WEAR SUB
The blast joint acts for conversion and connection of drill stem component in petroleum, natural gas and geology drilling work. It is the main tool for connecting the upper drilling tool with the lower drilling tool. The middle of the blast joint has vulcanized rubber to protect the inside wall of the casing and prevent the drill pipe from eccentric wear.
SAVER SUB WIHT RUBBER